portshopping.blogg.se

Accu chek inform ii linearity
Accu chek inform ii linearity












  1. #Accu chek inform ii linearity full#
  2. #Accu chek inform ii linearity code#
  3. #Accu chek inform ii linearity download#

make sure cap is replaced as soon as possible after opening between each use. Blue dye- will stain clothing/fingers Strips can be handled without any issue. However, if this is a reoccurring issue-meter should be sent to lab for investigationĪccu-Chek Inform II Test Strips – 50/vial (replace cap immediately!) leave at Room Temp Expiry date on vial is valid, opened or un-opened! Up to 10 mins to apply sample Insert strip face up with arrows pointing in to meter! Accu-Chek Performa Control Solutions Control 1 (lo) and Control 2 (hi) Good for 3 months at Room Temp after opening (or to expiry date on vial) - write open date on vial.

accu chek inform ii linearity

The reset button is a REBOOT only, with no loss of patient data or meter configuration settings.

#Accu chek inform ii linearity code#

(for meter freeze situation, press gently with paper clip a few seconds to re-boot) Re-Chargeable Battery Pack Charging Contacts (To Base Unit) Infra-red contact to upload lot information The reset button should be used to correct unspecified errors when the meter is not responding for any reason, examples include when the screen freezes, or when an error code is encountered. To select any of these functions, simply touch the button on the screen On/Off Button: Press this button to turn the meter on or off. Touchscreen (touch-sensitive display): This screen allows you to perform patient and controls tests, review results. Test Strip Port Barcode Scanner (Laser) Touchscreen-Main menu with 3 options (finger touch only) Test Strip Port: Insert the test strip here – it is the ONLY opening on meter The integrated barcode scanner can be used to read operator and patient IDs, and reagent lot numbers (test strips and controls).-Ensure that you don’t flash bar code scanner at eyes-yours or others. Tote Box Meter, strips, alcohol swabs controls, lancets, ref guide Accu-Chek Inform II (wireless available - Blue light in Base unit)

#Accu chek inform ii linearity download#

No data is lost if meter taken from docking station during download phase to patient test. Code Key is not mentioned here as the training is geared to nursing end users and they will never see it, only POCCs use the code key reader to input the lot numbers of reagents.

#Accu chek inform ii linearity full#

But the meter can be used at any level of battery life, as it is charging tests per full charge. From a fully dead battery, if placed back in the base unit, it takes about 20 minutes to charge it enough to run a test. 6 hours to fully charge meter– Ideally, meters should always stay in base units.

accu chek inform ii linearity

Docking the ACI II on the base unit when not in use will ensure that the meter is operational when required. Red is when you first plug in Base Unit to power outlet until meter gets put in it Explain the 3 components of the system emphasizing the charging function of the base unit. Inform II Quizīase Unit for automatic data transfer AND charging battery Green light when charging and sitting properly in Base unit. Perform a quality control test (QC) – Hands On 5. All other trademarks are the property of their respective owners.ġ. Do not place the meter in the base unit or plug the base unit into an electrical outlet until all components are completely dry.ĥ.ACCU-CHEK, ACCU-CHEK INFORM, ACCU-CHEK PERFORMA and COBAS are trademarks of Roche. Allow meter and base unit to thoroughly air dry. If liquid does contact theses areas, immediately dry the components with a dry cloth or gauze.ĭiscard wipes and remove gloves. Avoid wiping over the metal electrical connectors on the back of the base unit or the cableĬonnector areas located on the bottom of the base unit. Ensure meter is on a level surface to prevent excess liquid form entering the test strip port area. Clean and Disinfect (if not visibly soiled or after visible soil is removed) Using a pre-moistened cleaning wipe (ensure it is not dripping wet) to carefully wipe the surfaces Of the meter, base unit, and tote to remove visible soil.

accu chek inform ii linearity

Remove gross soil (if visibly soiled) Use a pre-moistened cleaning wipe (ensure it is not dripping wet) to carefully scrub the surfaces Remove meter from the base unit and unplug base unit from electrical outlet.ģ.














Accu chek inform ii linearity